Installation Procedure
- Position the retainer (1) to the instrument panel, making sure the 2 lugs (2) are engaged.
- Install the 3 screws (3) securing the retainer (1) to the instrument panel.
Tighten: Tighten the 3 screws to 2 N.m (18 lb in).
- Install the screw (4) securing the retainer (1) to the air duct.
Tighten: Tighten the screw to 2 N.m (18 lb in).
- Install the 2 screws (5) securing the data link connector (6) to the retainer (1).
Tighten: Tighten the 2 screws to 2 N.m (18 lb in).
- Install the knee bolster panel. Refer to Knee Bolster Replacement - Left .
- Install the left closeout/insulator panel. Refer to Closeout/Insulator Panel Replacement - Left .
NOTE:
Refer to Fastener Notice
in Cautions and Notices.