Installation Procedure
- Align the steering column opening filler panel to the I/P lower trim panel. Press the filler panel retainers into the I/P lower trim panel openings.
- Install the steering column opening filler panel screws (1, 2, 3).
Tighten: Tighten the screws to 2 N.m (18 lb in).
- Align the DLC to the I/P trim pad. Install the DLC to the trim pad.
- Install the I/P accessory trim plate. Refer to Trim Plate Replacement - Instrument Panel (I/P) Accessory .
- Install the ignition switch bezel.
- Install the left I/P fuse block access hole cover.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.