LEMON Manuals: Even more car manuals for everyone
Home >> Pontiac >> 2003 >> Vibe Base, FWD, Standard >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 8 (Automatic Transmission - Mu4) >> Automatic Transmission Oil Cooler >> Torque Converter Replacement >> Installation Procedure

Installation Procedure

WARNING: This page is about a different variant/trim than selected.
  1. Install the Input shaft seal to input shaft.
  2. Install the following to the torque converter:
    1. 2.1 Install the torque converter seal to transmission.
    2. 2.2 Install the converter seal bolts to transmission.

      Tighten 

      Tighten the torque converter seals bolts to 3 N.m (26 lb in).

  3. Install the torque converter (1) to the transmission. Push the torque converter into position while rotating. The torque converter must be fully seated.
  4. Install the transmission. Refer to REMOVAL & INSTALLATION - A/T (FWD) .
    Fig 1: Installing Input Shaft Seal To Input Shaft
    G03415512Courtesy of GENERAL MOTORS CORP.