Pressure Switch
Depressurize Powermaster unit. Disconnect electrical connector from pressure switch. Remove pressure switch and discard "O" ring. Install new "O" ring on pressure switch. Install pressure switch. Tighten to 15-20 ft. lbs. (20-27 N.m). Reconnect electrical connector to pressure switch.