LEMON Manuals: Even more car manuals for everyone
Home >> Plymouth >> 1990 >> Colt Base >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 1.8L 4-CYL - VIN [T], 2.0L 4-CYL [V], 2.4L 4-CYL [W] >> Removal & Installation >> Cylinder Head >> Installation (Colt Wagon 1.8L & Colt Vista 2.0L)

Installation (Colt Wagon 1.8L & Colt Vista 2.0L)

  1. Install cylinder head using new gasket. Ensure identification mark at timing belt end of gasket faces upward. DO NOT apply sealant to head gasket. Install and tighten cylinder head bolts (in 2-3 steps) to specification in proper sequence. See Fig 1.
  2. To install remaining components, reverse removal procedure. Apply sealant to contact surfaces of semi-circular packing. Apply gasoline to "O" ring on fuel line before installing fuel line in fuel delivery pipe. Adjust all control cables. Fill cooling system.
Fig 1: Cylinder Head Bolt Sequence (1.8L & 2.0L)
G90E08809Courtesy of CHRYSLER MOTORS.