LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2021 >> NV2500 HD S >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 7 (Automatic Transmission (DTC/Circuit Diagnosis) (Re7R01B)) >> DTC/Circuit Diagnosis >> Shift Lock System >> Component Inspection (Shift Lock Solenoid)

Component Inspection (Shift Lock Solenoid)

WARNING: This page is about a different variant/trim than selected.
  1. CHECK SHIFT LOCK SOLENOID 

    Apply voltage to terminals of shift lock solenoid and park position switch (shift selector) connector and check that shift lock solenoid is activated.

    CAUTION:
    • Connect the fuse between the terminals when applying the voltage.
    • Never cause shorting between terminals.

    (+)

    (-)

    Condition

    Status

    A/T shift selector

    Terminals

    3

    1

    Apply 12 V between terminals 3 and 1 with the park position switch (shift selector) in "P" (park) position.

    Shift lock solenoid operates.

    Is the inspection result normal?

    YES

    Inspection End.

    NO

    Replace A/T shift selector. Refer to Removal and Installation .