LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2021 >> NV2500 HD S >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (Engine Mechanical (5.6L)) >> Removal And Installation >> Oil Jet (Bank 2) >> Removal and Installation >> Removal

Removal and Installation: Removal

WARNING: This page is about a different variant/trim than selected.
  1. Remove the timing chains, slack guides and tension guides. Refer to Removal and Installation .
  2. Turning the base line (B) upwards, insert oil jet [bank 2 (1)] into Tool (A).
    GNSJPBIA6630Z-630Courtesy of NISSAN NORTH AMERICA, INC.
    CAUTION:
    • There is no base line before service part is setup. (Base line is applied from service part.)
    • Set Tool so that position matches ground-side (D) and flat side (C) shown in the figure.

    Tool

    :--(J-51269-1)

    SYMBOL

    : Vehicle front

  3. Press Tool inner (A) into Tool outer (B) until it bottoms out and tighten bolts (C).
    GNSJPBIA6631Z-631Courtesy of NISSAN NORTH AMERICA, INC.

    SYMBOL

    : Vehicle front

  4. Hand tighten nut (D).
  5. Hold Tool (A) with a suitable tool (B) and tighten nut to remove oil-jet (bank 2).
    GNSJPBIA6632Z-632Courtesy of NISSAN NORTH AMERICA, INC.
    CAUTION: Beware of enlarging the hole diameter caused by tilting the Tool.

    Tool

    :--(J-51269-1)

    SYMBOL

    : Vehicle front