Diagnosis Procedure

WARNING: This page is about a different car, the 2020 Infiniti QX60. However, it is still accessible from the selected car via links, so may be relevant.
  1. CHECK FUSIBLE LINKS 

    Check that the following fusible links are not blown.

    Terminal No.

    Signal name

    Fusible link No.

    1

    Fusible link main

    E (80A)

    2

    Fusible link IPDM E/R

    A (250A), C (80A)

    3

    Fusible link ignition switch

    A (250A), B (100A), K (40A)

    Is the fusible link blown?

    YES

    Replace the blown fusible link after repairing the affected circuit.

    NO

    GO TO 2.

  2. CHECK POWER SUPPLY CIRCUIT 
    1. Disconnect IPDM E/R connectors E118 and E120.
    2. Check voltage between IPDM E/R connectors and ground.

      IPDM E/R

      Ground

      Voltage

      (Approx.)

      Connector

      Terminal

      E118

      1

      --

      Battery voltage

      2

      E120

      3

    Is the inspection result normal?

    YES

    GO TO 3.

    NO

    Repair or replace harness or connectors.

  3. CHECK GROUND CIRCUIT 
    1. Disconnect IPDM E/R connectors E119 and E121.
    2. Check continuity between IPDM E/R connectors and ground.

      IPDM E/R

      Ground

      Continuity

      Connector

      Terminal

      E121

      7

      --

      Yes

      E119

      41

    Is the inspection result normal?

    YES

    Inspection End.

    NO

    Repair or replace harness or connectors.