LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2021 >> NV2500 HD S >> Repair and Diagnosis >> External Pages >> Different car >> Section 615 (Engine Mechanical) >> Removal And Installation >> Valve Timing Control >> Valve Timing Control Cover (bank 2) >> Removal

Valve Timing Control Cover (bank 2): Removal

WARNING: This page is about a different car, the 2020 Infiniti QX60. However, it is still accessible from the selected car via links, so may be relevant.
  1. Remove power steering oil pump. Refer to Removal and Installation .
  2. Disconnect the harness connectors from electric intake valve timing control actuator (bank 2).
  3. Disconnect the harness connector from exhaust valve timing control solenoid valve (bank 2).
  4. Remove electric intake valve timing control actuator (bank 2) and exhaust valve timing control solenoid valve (bank 2) from valve timing control cover (bank 2).
    CAUTION: Do not reuse O-rings.
  5. Remove the intake valve timing control cover [bank 2 (B)].
    • Loosen the intake valve timing control cover [bank 2 (B)] bolts in reverse of the sequence shown, below.
      GNSAWBIA3309Z-309Courtesy of NISSAN NORTH AMERICA, INC.

      (A)

      : Bank 1