Valve Timing Control Cover (bank 2): Installation
WARNING: This page is about a different car, the 2020 Infiniti QX60. However, it is still accessible from the selected car via links, so may be relevant.
Installation is in the reverse order of removal.
CAUTION:
- Do not reuse O-rings.
- Lubricate O-rings with clean engine oil prior to installation.
- Install intake valve timing control cover using the following procedure:
- Tighten the intake valve timing control cover [bank 2 (B)] bolts to the specified torque in the sequence shown, below.
Courtesy of NISSAN NORTH AMERICA, INC.
CAUTION: Perform ELECTRIC IVT CONTROL ACTUATOR POSITION LEARNING. Refer to Description .Bolts
: 11.3 N.m (1.2 kg-m, 8 ft-lb)
(A)
: Bank 1
- Tighten the intake valve timing control cover [bank 2 (B)] bolts to the specified torque in the sequence shown, below.