LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2021 >> NV2500 HD S >> Repair and Diagnosis >> External Pages >> Different car >> Section 592 (Meter, Warning Lamp & Indicator (DTC/Circuit Diagnosis)) >> DTC/Circuit Diagnosis >> Parking Brake Switch Signal Circuit >> Component Inspection

Component Inspection

WARNING: This page is about a different car, the 2020 Infiniti QX60. However, it is still accessible from the selected car via links, so may be relevant.
  1. CHECK PARKING BRAKE SWITCH 

    Check continuity between parking brake switch terminal 1 and switch case ground.

    Component

    Terminal

    Condition

    Continuity

    Parking brake switch

    1

    Parking brake applied

    Yes

    Parking brake released

    No

    Is the inspection result normal?

    YES

    Inspection End.

    NO

    Replace parking brake switch. Refer to Exploded View .