DTC Diagnosis Procedure
The output voltage of the generator is controlled by the IC regulator at terminal "3" (S) detecting the input voltage. Terminal "3" circuit detects the battery voltage to adjust the generator output voltage with the IC regulator.
- CHECK VOLTAGE REGULATOR CIRCUIT CONNECTION
Check to see if connector E205 terminal 3 is clean and tight.
Is the inspection result normal?
YES
GO TO 2.
NO
Repair terminal "3" connection. Confirm repair by performing system test using the DSS-5000P NI. Refer to the applicable Instruction Manual for proper testing procedures.
- CHECK VOLTAGE REGULATOR CIRCUIT
Check voltage between generator harness connector E205 terminal 3 and ground.
(+)
(-)
Voltage
Connector
Terminal
E205
3
Ground
Battery Voltage
Is the inspection result normal?
YES
Refer to Work Flow (With DSS-5000P NI) or Work Flow (Without DSS-5000P NI) .
NO
Check harness for open between generator and fuse.