DTC Diagnosis Procedure
- CHECK FUSES AND FUSIBLE LINK
Check that the following fuses and fusible link are not blown.
Terminal No.
Signal name
Fuses and fusible link No.
57
Battery power supply
22 (10A)
70
J (40A)
11
Ignition ACC or ON
9 (10A)
38
Ignition ON or START
12 (10A)
Is the fuse or fusible link blown?
YES
Replace the blown fuse or fusible link after repairing the affected circuit.
NO
GO TO 2.
- CHECK POWER SUPPLY CIRCUIT
- Turn ignition switch OFF.
- Disconnect BCM connectors.
- Check voltage between BCM connector and ground.
Terminals
Ignition switch position
(+)
(-)
BCM
OFF
ACC
ON
Connector
Terminal
M20
70
Ground
Battery voltage
Battery voltage
Battery voltage
57
M18
11
Approx. 0 V
Battery voltage
Battery voltage
38
Approx. 0 V
Approx. 0 V
Battery voltage
Is the inspection result normal?
YES
GO TO 3.
NO
Repair harness or connector.
- CHECK GROUND CIRCUIT
Check continuity between BCM connector and ground.
BCM
Ground
Continuity
Connector
Terminal
M20
67
Yes
Is the inspection result normal?
YES
Inspection End.
NO
Repair harness or connector.