Removal and Installation: Removal
WARNING: This page is about a different car, the 2019 Nissan NV3500 HD, 2019 Nissan NV2500 HD, and 2019 Nissan NV1500. However, it is still accessible from the selected car via links, so may be relevant.
- Remove front under cover. Refer to Removal and Installation .
- Remove air duct and resonator assembly. Refer to Removal and Installation .
- Disconnect crankcase ventilation hose.
- Remove electric throttle control actuator as follows:
- Partially drain engine coolant. Refer to Changing Engine Coolant
.WARNING: To avoid the danger of being scalded, do not drain engine coolant when engine is hot.CAUTION:
- Perform when engine is cold.
- Do not spill engine coolant on drive belt.
- Disconnect water hoses from electric throttle control actuator.
- Disconnect harness connector.
- Loosen bolts in reverse order as shown.CAUTION:
- Handle carefully to avoid any shock to electric throttle control actuator.
- Do not disassemble.
- Partially drain engine coolant. Refer to Changing Engine Coolant
.
- Remove the PCV hose.
- Loosen bolts in reverse order as shown to remove intake manifold collector support.
- Disconnect EVAP hoses and harness connector from EVAP canister purge volume control solenoid valve.
- Remove EVAP canister purge volume control solenoid valve.
- Remove VIAS control solenoid valve (if equipped) and vacuum tank.NOTE: Add mating marks as necessary for easier installation.
- Loosen nuts and bolts in the order shown and then remove the intake manifold collector.
: Front
CAUTION: Cover engine openings to avoid entry of foreign materials.