LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2021 >> NV2500 HD S >> Repair and Diagnosis >> External Pages >> Different car >> Section 499 (Charging System) >> Basic Inspection >> Charging System Preliminary Inspection >> Inspection Procedure

Inspection Procedure

WARNING: This page is about a different car, the 2019 Nissan NV3500 HD, 2019 Nissan NV2500 HD, and 2019 Nissan NV1500. However, it is still accessible from the selected car via links, so may be relevant.
  1. CHECK BATTERY TERMINALS CONNECTION 

    Check if battery terminals are clean and tight.

    Is the inspection result normal?

    YES

    GO TO 2.

    NO

    Repair battery terminals connection.

  2. CHECK FUSE 

    Check for blown fuse and fusible link.

    Unit

    Power source (Power supply terminals)

    Fuse or Fusible Link

    Generator

    Battery (terminal 3)

    Fuse 26

    Battery (terminal 1)

    Fusible Link A

    Combination meter

    Ignition switch ON (terminal 2)

    Fuse 12

    Is the fuse or fusible link blown?

    YES

    Replace the blown fuse or fusible link after repairing the affected circuit.

    NO

    GO TO 3.

  3. CHECK GENERATOR GROUND TERMINAL CONNECTION 

    Verify connector E206 (VQ40DE) or E215 (VK56VD) terminal 5 (generator ground harness) is clean and tight.

    Is the inspection result normal?

    YES

    GO TO 4.

    NO

    Repair connection.

  4. CHECK DRIVE BELT TENSION 

    Check drive belt tension. Refer to Checking Drive Belts (VQ40DE) or Checking (VK56VD).

    Is the inspection result normal?

    YES

    Inspection End.

    NO

    Repair as needed.