LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2021 >> NV2500 HD S >> Repair and Diagnosis >> External Pages >> Different car >> Section 212 (Engine Mechanical (CUMMINS 5.0L) (2 Of 2)) >> Unit Removal And Installation >> Engine Assembly >> Removal and Installation >> Inspection After Installation

Inspection After Installation

WARNING: This page is about a different car, the 2018 Nissan Titan XD. However, it is still accessible from the selected car via links, so may be relevant.
  1. Check engine oil, engine coolant and other fluids levels, if less then the required quantity, fill to the specified level. Refer to Cummins (5.0L V8D) Engine: Fluids and Lubricants
  2. Disconnect the ECM to prevent engine from starting.
  3. Remove the oil pressure sensor (1) from the cylinder block on the front left side of the engine. Refer to Removal and Installation .
    GNSALBIA1483Z-483Courtesy of NISSAN NORTH AMERICA, INC.
  4. Install Tool (1) into the port and install the oil pressure sensor (2) into the other end of the Tool and thread Tool into Tool (1).
    GNSALBIA1517Z-517Courtesy of NISSAN NORTH AMERICA, INC.

    Tool number

    : - (J-54412)

  5. Connect suitable tool (3) and crank the engine until the suitable tool indicates a positive oil pressure.
    CAUTION: To avoid possible engine damage:
    • Fill the oil pump with oil.
    • Prime the lubricating oil system after engine repair or rebuild service activities.
    • Confirm oil pressure within 15 seconds of start up, shut down engine immediately if no oil pressure is produced after 15 seconds.
  6. After positive oil pressure is observed, connect the ECM.
  7. Remove the Tool assembly from the port and install the oil pressure sensor (1). Refer to Removal and Installation .
    GNSALBIA1483Z-483Courtesy of NISSAN NORTH AMERICA, INC.
  8. Prime the fuel system. Refer to Priming .
    NOTE: During priming, check for fuel leaks at connection points.
  9. Operate the engine at low idle for 2 to 3 minutes and shut the engine off.
    NOTE: Wait 5 to 7 minutes for engine oil to drain back to oil pan.
  10. Check the engine oil level. Refer to Inspection .
  11. Check the engine coolant level. Refer to System Inspection .
  12. Operate the engine at 1000 to 1200 RPM for 8 to 10 minutes.
    NOTE:
    • Check for proper operation, unusual noises and coolant/fuel/exhaust/charge air/engine oil leaks.
    • If hydraulic pressure inside timing chain tensioner drops after removal and installation, slack in the guide may generate a pounding noise during and just after engine start. However, this is normal. Noise will stop after hydraulic pressure rises.
  13. Allow engine to cool and re-check engine oil and engine coolant.
  14. Using CONSULT, read and clear any fault codes.
    NOTE: For any active fault codes. Refer to DTC Index .
    • Summary of the inspection items:

      Item

      Before starting engine

      Engine running

      After engine stopped

      Engine coolant

      Level

      Leakage

      Level

      Engine oil

      Level

      Leakage

      Level

      Transmission/transaxle fluid

      A/T and CVT Models

      Leakage

      Level/Leakage

      Leakage

      M/T Models

      Other oils and fluids*

      Level

      Leakage

      Level

      Fuel

      Leakage

      Leakage

      Leakage

      Exhaust gas

      -

      Leakage

      -

      *Power steering fluid, brake fluid, etc.