LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2021 >> NV2500 HD S >> Repair and Diagnosis >> External Pages >> Different car >> Section 212 (Engine Mechanical (CUMMINS 5.0L) (2 Of 2)) >> Removal And Installation >> High-Pressure Turbocharger >> Removal And Installation >> Installation

Removal And Installation: Installation

WARNING: This page is about a different car, the 2018 Nissan Titan XD. However, it is still accessible from the selected car via links, so may be relevant.
  1. When installing a new high-pressure turbocharger, cover opening for turbocharger speed sensor with Tool.

    Tool : - (J-54423)

  2. Install turbocharger oil drain line onto the high-pressure turbocharger. Refer to Exploded View.
    CAUTION: Do not reuse O-ring or turbocharger oil drain line gasket.
    NOTE: Apply clean engine oil to O-ring before installation.
  3. Remove the Tool from the low-pressure turbocharger before installing the high-pressure turbocharger.

    Tool : - (J-54423)

  4. Install a new O-ring on the low-pressure turbocharger and lubricate with a suitable water-based lubricant.
    CAUTION: Do not reuse O-ring.
  5. Install the high-pressure turbocharger gasket and high-pressure turbocharger and hand-tighten bolts.
    CAUTION: Do not reuse high-pressure turbocharger gasket or O-rings.
    NOTE: Apply anti-seize to high-pressure turbocharger bolts before installation.
  6. Install and hand-tighten the turbocharger oil supply line.
    CAUTION: Do not reuse copper sealing washers.
  7. Install turbocharger oil drain line into cylinder block and tighten to the specified torque.
    NOTE: Lubricate the turbocharger oil drain line O-ring with clean engine oil.

    Turbocharger oil drain line bolt : 9.8 N.m (1.00 kg-m, 87 in-lb)

  8. Install the turbocharger compressor outlet connection and turbocharger compressor bypass valve (1) onto the high-pressure turbocharger (2).
    G00400480Courtesy of NISSAN NORTH AMERICA, INC.
    CAUTION: Do not reuse bolts (A).
    NOTE: Before installing turbocharger compressor outlet connection and turbocharger compressor bypass valve, lubricate O-rings on high-pressure turbocharger with a suitable water based lubricant.
  9. Tighten the high-pressure turbocharger bolts to the specified torque.

    High-pressure turbocharger bolts : 32 N.m (3.3 kg-m, 24 ft-lb)

  10. Tighten the turbocharger oil supply line to the specified torque.

    Tighten the turbocharger oil supply line to the specified torque.

    (high-pressure turbocharger side) : 22 N.m (2.2 kg-m, 16 ft-lb), (low-pressure turbocharger side) : 34 N.m (3.5 kg-m, 25 ft-lb)

  11. Tighten the support bracket bolt and turbocharger compressor bypass valve bolts to the specified torque.

    Support bracket bolt : 24 N.m (2.4 kg-m, 18 ft-lb), Turbocharger compressor bypass valve bolts : 10 N.m (1.0 kg-m, 89 in-lb)

  12. Installation of the remaining components is in the reverse order of removal.
    CAUTION: Do not reuse O-rings.
    NOTE: Lubricate air handling component O-rings with a suitable water-based lubricant.