Inspection Procedure
- CHECK BATTERY TERMINALS CONNECTION
Check if battery terminals are clean and tight.
Is the inspection result normal?
YES
GO TO 2 .
NO
Repair battery terminals connection.
- CHECK FUSE
Check for blown fuse and fusible link:
With Cummins 5.0LUnit
Power source (Power supply terminals)
Fuse or Fusible Link
Generator
Battery (terminal 3)
Fuse 70 (10 A)
Battery (terminal 1)
Fusible Link A (250 A)
Combination meter
Ignition switch ON or START (terminal 2)
Fuse 13 (10 A)
With VK56VDUnit
Power source (Power supply terminals)
Fuse or Fusible Link
Generator
Battery (terminal 3)
Fuse 66 (10 A)
Battery (terminal 1)
Fusible Link A (250 A)
Combination meter
Ignition switch ON or START (terminal 2)
Fuse 13 (10 A)
Is the inspection result normal?
YES
GO TO 3 .
NO
Be sure to eliminate cause of malfunction before installing new fuse or fusible link.
- CHECK GENERATOR GROUND TERMINAL CONNECTION
Verify connector F201 (with Cummins 5.0L) or F240 (with VK56VD) (generator ground harness) terminal 5 is clean and tight.
Is the inspection result normal?
YES
GO TO 4 .
NO
Repair connection.
- CHECK DRIVE BELT TENSION
Check drive belt tension. Refer to Inspection (with VK56VD) or Inspection (with Cummins 5.0L).
Is the inspection result normal?
YES
Inspection End.
NO
Repair as needed.