LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2021 >> NV2500 HD S >> Repair and Diagnosis >> External Pages >> Different car >> Section 126 (Engine Mechanical (CUMMINS 5.0L) (1 Of 2)) >> Removal And Installation >> Exhaust Manifold >> Removal and Installation - Bank 1 >> Removal

Removal and Installation - Bank 1: Removal

WARNING: This page is about a different car, the 2018 Nissan Titan XD. However, it is still accessible from the selected car via links, so may be relevant.
CAUTION: To avoid possible engine and system damage or performance issues:
  • Brush away all dirt and debris from the area prior to opening any fuel, air intake, exhaust, cooling, aftertreatment or other engine system.
  • To avoid contamination, any open engine system ports must be closed immediately with clean care caps or an appropriate covering.
  • Do not allow any debris to fall into the engine.
  • Do not allow any chemical cleaners to enter the engine or any open systems during the cleaning process.
  1. Remove the exhaust manifold heat shield. Refer to Exploded View .
  2. Remove the heat shields [(RH) and (center)]. Refer to Removal and Installation .
  3. Remove the studs (A) and nuts (B) connecting the exhaust manifold (2) to the exhaust transfer tube (1).
    GNSALBIA2098Z-098Courtesy of NISSAN NORTH AMERICA, INC.
    NOTE:
    • Apply penetrating oil to the exhaust manifold and transfer tube studs and nuts before removal.
    • Bank 2 shown, bank 1 similar

    SYMBOL

    : Front

  4. Remove the exhaust manifold lock plates (4) and nuts (A).
    GNSAWBIA2856Z-856Courtesy of NISSAN NORTH AMERICA, INC.
    NOTE:
    • Bank 2 shown. Bank 1 similar

    SYMBOL

    : Front

  5. Remove the exhaust manifold (2). Remove and discard the exhaust manifold gasket (1) and exhaust outlet gasket (3).
    CAUTION: Do not reuse the following:
    • Lock plates
    • Exhaust manifold gasket
    • Exhaust manifold outlet gasket
  6. Remove the exhaust manifold studs (if necessary).