Removal and Installation: Installation
WARNING: This page is about a different car, the 2018 Nissan Titan XD and 2018 Nissan Titan. However, it is still accessible from the selected car via links, so may be relevant.
- Install bolts in the following torque sequence: (1) bump/hand start, (2), (3), (4), (1) full run down.
: Front
Remainder of installation is in the reverse order of removal.
CAUTION: Perform the calibration and perform the writing to the around view monitor control unit when removing and replacing each camera, removing the camera mounting parts (front grille, door mirror, etc.) and replacing the around view monitor control unit. Refer to Work Procedure .NOTE: After installation perform headlamp aiming adjustment. Refer to Aiming Adjustment Procedure .