LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2020 >> Versa SR >> Repair and Diagnosis >> Electrical >> Motors, Switches, Relays >> Power Supply, Ground & Circuit Elements >> Removal And Installation >> Battery >> Battery Disconnect >> Installation

Battery Disconnect: Installation

Installation is in the reverse order of removal.

CAUTION: Replace the fusible link box (battery) if it has been dropped or sustained an impact.

To install the battery, carefully read the following instructions:

  • To prevent damage to the parts, connect the battery cable to the positive terminal first.
  • After connecting battery cables, to securely supply battery voltage, ensure battery cables are tightly clamped to battery terminals for good contact.
  • To securely supply battery voltage, check battery terminal for poor connection caused by corrosion.
  • Perform ADDITIONAL SERVICE WHEN REMOVING BATTERY NEGATIVE TERMINAL. Refer to After Work Procedure .

Battery terminal nuts

5.5 N.m (0.56 kg-m, 49 in-lb)