LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2019 >> Altima Edition ONE >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 6 (Engine Mechanical (Pr25DD) (2 Of 2)) >> Removal And Installation >> EGR Cooler >> Fwd >> EGR COOLER : Removal & Installation >> Installation

EGR COOLER : Removal & Installation: Installation

WARNING: This page is about a different variant/trim than selected.
  1. Install the EGR cooler bracket and tighten the bolts to the specified torque in the sequence shown.
    Fig 1: EGR Cooler Bracket Tightening Sequence
    GNSDB123775Courtesy of NISSAN NORTH AMERICA, INC.

    EGR cooler bracket bolts

    : 25.0 N.m (2.6 kg-m, 18 ft-lb)

  2. Install the EGR cooler and tighten the bolts to the specified torque in the sequence shown.
    GNSALBIA0512Z-512Courtesy of NISSAN NORTH AMERICA, INC.
    CAUTION: Do not reuse EGR cooler gasket.
    NOTE: Bolts 1 and 2 can be tightened from top of vehicle.

    EGR cooler bolts

    : 25.0 N.m (2.6 kg-m, 18 ft-lb)

  3. Installation of the remaining components is in the reverse order of removal.
    • Refill the engine coolant. Refer to Refilling .