LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2019 >> Altima Edition ONE >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 6 (Engine Mechanical (Pr25DD) (2 Of 2)) >> Removal And Installation >> EGR Cooler >> AWD >> EGR COOLER : Removal & Installation >> Installation

EGR COOLER : Removal & Installation: Installation

WARNING: This page is about a different variant/trim than selected.
  1. Install the EGR cooler bracket and tighten the bolts to the specified torque in the sequence shown.
    GNSDB123775Courtesy of NISSAN NORTH AMERICA, INC.

    EGR cooler bracket bolts

    : 25.0 N.m (2.6 kg-m, 18 ft-lb)

  2. Install the EGR cooler and tighten the bolts to the specified torque in the sequence shown.
    GNSALBIA0512Z-512Courtesy of NISSAN NORTH AMERICA, INC.
    CAUTION: Do not reuse EGR cooler gasket.
    NOTE: Bolts 1 and 2 can be tightened from top of vehicle.

    EGR cooler bolts

    : 25.0 N.m (2.6 kg-m, 18 ft-lb)

  3. Installation of the remaining components is in the reverse order of removal.
    • Refill the engine coolant. Refer to Refilling .