LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2019 >> Altima Edition ONE >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 5 (Engine Control System (Pr25DD) (3 Of 3)) >> Removal And Installation >> Electric Intake Valve Timing Control Module >> ELECTRIC INTAKE VALVE TIMING CONTROL MODULE : Removal & Installation >> Removal

ELECTRIC INTAKE VALVE TIMING CONTROL MODULE : Removal & Installation: Removal

WARNING: This page is about a different variant/trim than selected.
  1. Disconnect negative and positive battery terminals, then wait at least three minutes. Refer to BATTERY DISCONNECT : Removal & Installation .
  2. Remove the engine side cover (LH). Refer to FENDER PROTECTOR : Exploded View .
  3. Partially remove the fender protector (LH). Refer to FENDER PROTECTOR : Exploded View .
  4. Remove the air cleaner resonator. Refer to AIR CLEANER AND AIR DUCT : Removal & Installation .
  5. Disconnect the harness connector from the electric intake valve timing control module.
  6. Remove the electric intake valve timing control module nuts.
  7. Remove the electric intake valve timing control module.