LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2019 >> Altima Edition ONE >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 13 (Engine Lubrication System (Pr25DD)) >> Removal And Installation >> Engine Oil Pressure Control Solenoid Valve >> ENGINE OIL PRESSURE CONTROL SOLENOID VALVE : Removal & Installation >> PR25DD engine >> Installation

PR25DD engine: Installation

WARNING: This page is about a different variant/trim than selected.
  1. Install the engine oil pressure control solenoid valve and tighten bolts to the specified torque in the sequence shown.
    GNSALBIA0436Z-436Courtesy of NISSAN NORTH AMERICA, INC.

    Bolts

    : 9.0 N.m (0.9 kg-m, 80 in-lb)

    CAUTION:
    • Do not reuse O-rings.
    • Ensure engine oil pressure control solenoid valve O-ring sealing surface is free from dents or flaws.
    • Apply clean engine oil to O-rings.
    • Ensure engine oil pressure control solenoid valve harness is pushed to baffle side to avoid interference with upper oil pan and oil strainer.
  2. Install the oil strainer and tighten bolts to the specified torque in the sequence shown.
    GNSALBIA0435Z-435Courtesy of NISSAN NORTH AMERICA, INC.
    CAUTION: Do not reuse O-ring.

    Bolts

    : 9.0 N.m (0.9 kg-m, 80 in-lb)

  3. Installation of the remaining components is in the reverse order of removal.