LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2012 >> Sentra SE-R >> Repair and Diagnosis (Single Page) >> Engine Mechanical >> Engine Mechanical (Qr25DE) >> Service Information >> Camshaft >> Removal and Installation >> Inspection After Removal >> Camshaft End Play

Camshaft End Play

  1. Install a dial gauge in the thrust direction on the front end of the camshaft. Measure the end play with the dial gauge while moving the camshaft forward and backward (in direction to axis).

    Standard end play: 0.115 - 0.188 mm (0.0045 - 0.0074 in) 

    Fig 1: Checking Camshaft End Play
    G04899733Courtesy of NISSAN NORTH AMERICA, INC.
  2. If out of the specified range, replace with new camshaft and measure again.
  3. If out of the specified range again, replace with new cylinder head assembly.