LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2012 >> Cube Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 30 (SRS (Supplemental Restraint System)) >> ODS Unit Operation Check >> Pre-Operation Check Set-up

Pre-Operation Check Set-up

WARNING: This page is about a different car, the 2013 Honda Fit, 2012 Honda Fit, 2011 Honda Fit, 2010 Honda Fit, and 2009 Honda Fit. However, it is still accessible from the selected car via links, so may be relevant.
  1. Drive the vehicle, accelerate to 22 mph (36 km/h), then stop on level ground.
  2. Make sure the ignition switch is in LOCK (0).
  3. Connect the HDS to the data link connector (DLC) (A).
    Fig 1: Identifying Data Link Connector
    G05960432Courtesy of AMERICAN HONDA MOTOR CO., INC.
  4. Turn the ignition switch to ON (II).
  5. Make sure the HDS communicates with the vehicle and the SRS unit. If it does not communicate, troubleshoot the DLC circuit (see DLC CIRCUIT TROUBLESHOOTING ).
  6. From the HDS Main Menu, select SRS, then Inspection. In the Inspection Menu, select AFTER REPLACING FRONT PASSENGER'S SEAT COMPONENT(S). Follow the prompts until the ODS unit operation check has been completed.
  7. Turn the ignition switch to LOCK (0).
  8. Disconnect the HDS from the DLC.