LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2012 >> Cube Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 127 (Under-Dash Fuse/Relay Box) >> Removal and Installation >> Removal

Removal and Installation: Removal

WARNING: This page is about a different car, the 2013 Acura MDX, 2012 Acura MDX, 2011 Acura MDX, and 2010 Acura MDX. However, it is still accessible from the selected car via links, so may be relevant.
  1. Do the battery terminal disconnection procedure (see USING THE GR8 BATTERY DIAGNOSTIC STATION ), and wait for at least 3 minutes.
  2. Remove the left kick panel (see TRIM REMOVAL/INSTALLATION - DOOR AREAS ).
  3. Disconnect the connectors from the fuse side of the under-dash fuse/relay box (A).
    Fig 1: Locating Under-Dash Fuse/Relay Box
    G08055161Courtesy of AMERICAN HONDA MOTOR CO., INC.
  4. Remove the mounting bolts, and pull the under-dash fuse/relay box away from the body.
  5. Disconnect the connectors from the back side of the under-dash fuse/relay box, then remove the under-dash fuse/relay box.
  6. Using the relay puller, carefully remove the relays by prying under the base of the relay (see POWER RELAY TEST ).
NOTE: Do not use pliers. Pliers will damage the relays, which could cause the engine to stall or not start or cause other functions to fail.