Cluster Lid C
Removal
- Remove the M/T or CVT shift selector handle. Refer to "REMOVAL AND INSTALLATION " (M/TRS6F94R), "REMOVAL AND INSTALLATION " (M/T-RS6F52A), "REMOVAL AND INSTALLATION " (M/TRS6F52H) or "SHIFT SELECTOR HANDLE REMOVAL AND INSTALLATION " (CVT).
- Release the M/T or CVT finisher, disconnect necessary connectors, and remove finisher. Refer to "COMPONENT PARTS "
- Remove the cluster lid C upper mask (non SE-R models). Refer to "COMPONENT PARTS "
- Remove the double meter (SE-R models). Refer to "REMOVAL AND INSTALLATION "
- Remove cluster lid C (1).
- Remove cluster lid C screws (A).
- Pull out cluster lid C (1) to disconnect harness connector and remove cluster lid C (1).
Installation
Installation is in the reverse order of removal.