Diagnosis Procedure
WARNING: This page is about a different car, the 2012 Nissan Pathfinder. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK GROUND CONNECTIONS
- Turn ignition switch OFF.
- Loosen and retighten ground screws on the body.
Refer to "GROUND INSPECTION ".
OK or NG
OK: GO TO 2.
NG: Repair or replace ground connections.
- CHECK INTAKE AIR TEMPERATURE SENSOR POWER SUPPLY CIRCUIT
- Disconnect mass air flow sensor (with intake air temperature sensor) (1) harness connector.
- : Vehicle front
- Turn ignition switch ON.
- Check voltage between mass air flow sensor terminal 5 and ground.
Voltage: Approximately 5 V
Courtesy of NISSAN NORTH AMERICA, INC.
OK or NG
OK: GO TO 3.
NG: Repair harness or connectors.
- Disconnect mass air flow sensor (with intake air temperature sensor) (1) harness connector.
- CHECK INTAKE AIR TEMPERATURE SENSOR GROUND CIRCUIT FOR OPEN AND SHORT
- Turn ignition switch OFF.
- Disconnect ECM harness connector.
- Check harness continuity between mass air flow sensor terminal 6 and ECM terminal 67.
Refer to WIRING DIAGRAM .
Continuity should exist .
- Also check harness for short to ground and short to power.
OK or NG
OK: GO TO 4.
NG: Repair open circuit or short to ground or short to power in harness or connectors.
- CHECK INTAKE AIR TEMPERATURE SENSOR
Refer to "COMPONENT INSPECTION ".
OK or NG
OK: GO TO 5.
NG: Replace mass air flow sensor (with intake air temperature sensor). Refer to AIR CLEANER AND AIR DUCT .
- CHECK INTERMITTENT INCIDENT
Refer to "INTERMITTENT INCIDENT ".
>> INSPECTION END