Diagnosis Procedure
WARNING: This page is about a different car, the 2009 Nissan Maxima. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK VIAS CONTROL SOLENOID VALVE 1 POWER SUPPLY CIRCUIT
- Turn ignition switch OFF.
- Disconnect VIAS control solenoid valve 1 harness connector.
- Turn ignition switch ON.
- Check the voltage between VIAS control solenoid valve 1 harness connector and ground.VOLTAGE SPECIFICATION
VIAS control solenoid valve 1 Ground Voltage Connector Terminal F63 1 Ground Battery voltage
Is the inspection result normal?
YES: GO TO 2.
NO: Repair open circuit, short to ground or short to power in harness or connectors.
- CHECK VIAS CONTROL SOLENOID VALVE 1 OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
- Turn ignition switch OFF.
- Disconnect ECM harness connector.
- Check the continuity between VIAS control solenoid valve 1 harness connector and ECM harness connector.CONTINUITY CHART
VIAS control solenoid valve 1 ECM Continuity Connector Terminal Connector Terminal F63 2 F14 27 Existed - Also check harness for short to ground and short to power.
Is the inspection result normal?
YES: GO TO 3.
NO: Repair open circuit, short to ground or short to power in harness or connectors.
- CHECK VIAS CONTROL SOLENOID VALVE 1
Refer to "COMPONENT INSPECTION ".
Is the inspection result normal?
YES: GO TO 4.
NO: Replace VIAS control solenoid valve 1.
- CHECK INTERMITTENT INCIDENT
Refer to "INTERMITTENT INCIDENT ".
: INSPECTION END