LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2004 >> Altima S, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 1107 (Power Supply, Ground & Circuit Elements) >> Removal And Installation >> Battery >> Removal and Installation >> Installation

Removal and Installation: Installation

WARNING: This page is about a different car, the 2012 Nissan Pathfinder. However, it is still accessible from the selected car via links, so may be relevant.

Installation is in the reverse order of removal.

CAUTION: When connecting battery terminals, connect positive battery terminal first.

Battery clamp nuts: 3.92 N.m (0.40 kg-m, 35 in-lb) 

Battery terminal nut: 3.4 N.m (0.35 kg-m, 30 in-lb) 

Reset electronic systems as necessary. Refer to ADDITIONAL SERVICE WHEN REMOVING BATTERY NEGATIVE TERMINAL: SPECIAL REPAIR REQUIREMENT .