Removal and Installation: Installation
WARNING: This page is about a different car, the 2012 Nissan Pathfinder. However, it is still accessible from the selected car via links, so may be relevant.
Installation is in the reverse order of removal. Note the following:
Intake Manifold Collector
- If stud bolts were removed from intake manifold, install them and tighten to the specified torque.
- Tighten nuts and bolts in numerical order as shown.
Intake manifold collector bolts and nuts: 11.0 N.m (1.1 kg-m, 8 ft-lb)
Stud bolts: 6.9 N.m (0.7 kg-m, 61 in-lb)
Electric Throttle Control Actuator
- Tighten bolts in numerical order as shown.
- Perform the "Throttle Valve Closed Position Learning" when harness connector of electric throttle control actuator is disconnected. Refer to "THROTTLE VALVE CLOSED POSITION LEARNING ".