Removal and Installation: Installation
WARNING: This page is about a different car, the 2009 Nissan Maxima. However, it is still accessible from the selected car via links, so may be relevant.
Installation is in the reverse order of removal. Follow the procedure below for specific tightening sequences and procedures.
- Install intake manifold bolts in two steps in the numerical order as shown.
Step 1: 7.3 N.m (0.74 kg-m, 65 in-lb)
Step 2: 25 N.m (2.6 kg-m, 19 ft-lb)
NOTE:
After installation, it is necessary to re-calibrate the electric throttle control actuator as follows:
- Perform the "Throttle Valve Closed Position Learning" when harness connector of the electric throttle control actuator is disconnected. Refer to "THROTTLE VALVE CLOSED POSITION LEARNING: SPECIAL REPAIR REQUIREMENT ".
- Perform the "Idle Air Volume Learning" when the electric throttle control actuator is replaced. Refer to
"IDLE AIR VOLUME LEARNING: SPECIAL REPAIR REQUIREMENT
".
- Install the quick connector as follows:
- Make sure no foreign substances are deposited in and around the fuel tube and quick connector and that there is no damage.
- Align the center to insert the quick connector straight onto the fuel tube.
- Insert the fuel tube until a click is heard.
- Install the quick connector cap on the quick connector joint. Align the arrow mark on the quick connector cap to the upper side.
- Install the fuel hose into the hose clamp.
- Install the quick connector as follows: