COMBINATION METER: Diagnosis Procedure
WARNING: This page is about a different car, the 2012 Nissan Pathfinder. However, it is still accessible from the selected car via links, so may be relevant.
Regarding Wiring Diagram information, refer to "WIRING DIAGRAM ".
- CHECK FUSES
Check for blown combination meter fuses.
Unit Power source Fuse No. Combination meter Battery 19 Ignition switch ON or START 14 Is the inspection result normal?
YES: GO TO 2
NO: If fuse is blown, be sure to eliminate cause of malfunction before installing new fuse.
- POWER SUPPLY CIRCUIT CHECK
- Disconnect combination meter connector M24.
- Check voltage between combination meter harness connector M24 terminals 3, 16 and ground.
Terminals Ignition switch position (+) (-) OFF ACC ON Connector Terminal M24 3 Ground Battery voltage Battery voltage Battery voltage 16 0V 0V Battery voltage
Courtesy of NISSAN NORTH AMERICA, INC.
Is the inspection result normal?
YES: GO TO 3
NO: Check harness for open between combination meter and fuse.
- GROUND CIRCUIT CHECK
- Turn ignition switch OFF.
- Check continuity between combination meter harness connector M24 terminals 13, 23 and ground.
Terminals Continuity (+) (-) Connector Terminal M24 13 Ground Yes 23 Courtesy of NISSAN NORTH AMERICA, INC.
Is the inspection result normal?
YES: Inspection End.
NO: Check ground harness.