Diagnosis Procedure
WARNING: This page is about a different car, the 2012 Nissan Pathfinder. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK CONNECTOR
- Turn the ignition switch OFF.
- Disconnect the battery cable from the negative terminal.
- Check the following terminals and connectors for damage, bend and loose connection (unit side and connector side).
- ECM
- Harness connector E2
- Harness connector F32
Is the inspection result normal?
YES: GO TO 2.
NO: Repair the terminal and connector.
- CHECK HARNESS FOR OPEN CIRCUIT
- Disconnect the connector of ECM.
- Check the resistance between the ECM harness connector terminals.
- VQ engine models
ECM harness connector Resistance (Ω) Connector No. Terminal No. E16 94 86 Approx. 108 - 132
- VK engine models
ECM harness connector Resistance (Ω) Connector No. Terminal No. E7 94 86 Approx. 108 - 132
Is the measurement value within the specification?
YES: GO TO 3.
NO: Repair the ECM branch line.
- CHECK POWER SUPPLY AND GROUND CIRCUIT
Check the power supply and the ground circuit of the ECM. Refer to the following.
- VQ40DE: "DIAGNOSIS PROCEDURE "
- VK56DE: "DIAGNOSIS PROCEDURE "
Is the inspection result normal?
YES (Present error)>>Replace the ECM. Refer to the following.
- VQ40DE: "PROCEDURE AFTER REPLACING ECM "
- VK56DE: "PROCEDURE AFTER REPLACING ECM "
YES (Past error)>>Error was detected in the ECM branch line.
NO: Repair the power supply and the ground circuit.