LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2003 >> Sentra Limited >> Repair and Diagnosis >> External Pages >> Different car >> Section 2238 (Starting System) >> DTC/Circuit Diagnosis >> S Connector Circuit >> Diagnosis Procedure - VK56DE

Diagnosis Procedure - VK56DE

WARNING: This page is about a different car, the 2012 Nissan Pathfinder. However, it is still accessible from the selected car via links, so may be relevant.

Regarding Wiring Diagram information, refer to "WIRING DIAGRAM - VK56DE ".

CAUTION: Before testing, perform the following procedure to ensure the engine cannot start.
  1. Remove fuel pump fuse.
  2. Crank or start the engine (where possible) until the fuel pressure is released.
  1. CHECK STARTER MOTOR MAGNETIC SWITCH CIRCUIT
    1. Turn ignition switch OFF.
    2. Disconnect starter motor connector F17.
    3. Shift transmission into park or neutral.
    4. Check voltage between starter motor harness connector F17 terminal 2 and ground with the ignition in START.
      (+) (-) Condition Voltage
      Connector Terminal
      F17 2 Ground While cranking the engine Battery voltage

      Is battery voltage present? 

      YES: Magnetic switch circuit is OK. Further inspection necessary. Refer to "WORK FLOW ".

      NO: GO TO 2

  2. CHECK CONNECTOR
    1. Turn ignition switch OFF.
    2. Check the IPDM E/R harness connector E120 and starter motor harness connector F17 for damage, bent pins and loose connections.

      Is the inspection result normal? 

      YES: GO TO 3

      NO: Repair the terminal and connector.

  3. CHECK HARNESS CONTINUITY (OPEN CIRCUIT)
    1. Disconnect IPDM E/R connector E120.
    2. Check continuity between starter motor harness connector F17 terminal 2 and IPDM E/R harness connector E120 terminal 19.
      Starter motor IPDM E/R Continuity
      Connector Terminal Connector Terminal
      F17 2 E120 19 Yes
    3. Check continuity between starter motor harness connector F17 terminal 2 and ground.
      Starter motor - Continuity
      Connector Terminal
      F17 2 Ground No

      Are the continuity test results as specified? 

      YES: Further inspection necessary. Refer to "WORK FLOW ".

      NO: Repair the harness.