Removal and Installation: Installation
WARNING: This page is about a different car, the 2012 Nissan Pathfinder. However, it is still accessible from the selected car via links, so may be relevant.
- Install new cylinder head gasket.
- Turn crankshaft until No. 1 piston is set at TDC.
- Crankshaft key should line up with the right bank cylinder center line as shown.
- Install cylinder head follow the steps below to tighten cylinder head bolts in numerical order as shown.CAUTION: If cylinder head bolts are re-used, check their outer diameters before installation. Refer to "REMOVAL AND INSTALLATION " (Cylinder Head Bolts Outer Diameter).
Step a: 98.1 N.m (10 kg-m, 72 ft-lb)
Step b: Loosen to 0 N.m in the reverse order of tightening .
Step c: 39.2 N.m (4.0 kg-m, 29 ft-lb)
Measure the tightening angle using Tool.
Tool number: KV10112100 (BT-8653-A)
Step d: 90° clockwise
Step e: 90° clockwise
- After installing cylinder head, measure distance between front end faces of cylinder block and cylinder head (left and right banks).
Standard: 14.1 - 14.9 mm (0.555 - 0.587 in)
Courtesy of NISSAN NORTH AMERICA, INC.
- If the measured value is out of the standard, re-install cylinder head.
- Installation of the remaining parts is in the reverse order of removal.