Removal and Installation: Installation
WARNING: This page is about a different car, the 2004 Nissan Quest. However, it is still accessible from the selected car via links, so may be relevant.
- Installation is in the reverse order of removal.NOTE: Notice component parts location and do not reuse non-reusable parts .
- Install pipe connector.
- Use the specified tightening torque when installing the high-pressure and low-pressure hose connections.CAUTION: Excessive tightening will damage threads of connection or O-ring.
- The O-ring in low-pressure hose connector is larger than that in high-pressure connector. Take care to install the proper O-ring.
- Initially, tighten nut on tie-rod outer socket and knuckle arm to specification. Then tighten further to align nut groove with first pin hole so that the cotter pin can be installed.
Outer tie-rod grooved nut : 34 N.m (3.5 kg-m, 25 ft-lb)
CAUTION: Tightening torque must not exceed 49 N.m (5 kg-m, 36 ft-lb). - Refill power steering system and bleed air after installation. Refer to "POWER STEERING FLUID ".