Canister Purge Control Valve: Testing and Inspection
COMPONENT INSPECTIONEVAP Canister Purge Control Valve
Check EVAP canister purge control valve as follows.
1. Plug the port (B).
2. Apply pressure [80.0 kPa (600 mmHg, 23.62 inHg)] to port (B). Then keep it for 15 seconds, and check there is no leakage.
3. Repeat step 2 for port (C).