LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 1994 >> Sentra (2 Door) L4-1597cc 1.6L DOHC MFI (GA16DE) >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Testing and Inspection >> Component Tests and General Diagnostics >> Component Tests >> Idle Speed/Ignition Timing/Idle Mixture Ratio Inspection

Idle Speed/Ignition Timing/Idle Mixture Ratio Inspection

Overall Inspection Sequence:





Preparation
1. Make sure that the following parts are in good order.

^ Battery
^ Ignition system
^ Engine oil and coolant levels
^ Fuses
^ ECM harness connector
^ Vacuum hoses
^ Air intake system (Oil filler cap, oil level gauge, etc.)
^ Fuel pressure
^ Engine compression
^ Throttle valve

2. On air conditioner equipped models, checks should be carried out while air conditioner is "OFF".
3. On automatic transaxle equipped models, when checking idle rpm, ignition timing and mixture ratio, checks should be carried out while shift lever is in "N" position.
4. When measuring "CO" percentage, insert probe more than 40 cm (15.7 in) into tail pipe.
5. Turn off headlamps, heater blower, rear defogger.
6. Keep front wheels pointed straight ahead.
7. Make the check after the cooling fan has stopped.

Specific Inspection Sequence

1 Of 7:




1 of 7

2 Of 7:




2 of 7

3 Of 7:




3 of 7

4 Of 7:




4 of 7

5 Of 7:




5 of 7

6 Of 7:




6 of 7

7 Of 7:




7 of 7