LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 1988 >> D21 Hardbody 4WD V6-2960cc 3.0L SOHC (VG30i) >> Repair and Diagnosis >> Transmission and Drivetrain >> Differential Assembly >> Service and Repair >> Side Bearing Preload & Final Assembly, 190 Model Axle

Side Bearing Preload & Final Assembly, 190 Model Axle


1. Ensure all parts are clean and that bearings are well lubricated with suitable oil.
2. Remove carrier side bearing using a suitable puller, then reinstall all original side bearing adjusting shims on carrier side (away from ring gear).
3. Press on carrier side bearing using suitable tools.
4. Install carrier and bearings into final drive housing.
5. Install side bearing caps and cap attaching bolts. Torque attaching bolts to 36-43 ft. lbs. and tap on caps with suitable hammer to seat bearings.
6. Turn carrier several times to seat bearings, then measure carrier turning force with suitable spring scale. Turning force at ring gear bolt should be 8-9 lbs.
7. If turning force is not as specified, correct by adding to or subtracting from the total amount of shim thickness.
8. Press in front and rear bearing outer races, then install selected pinion height adjusting washer in drive pinion and press in rear bearing outer race.
9. Place pinion front bearing inner race in gear carrier.
10. Apply suitable lubricant to cavity at sealing lips of oil seal, then install front oil seal.
11. Install drive pinion washer, collapsible spacer and drive pinion in gear carrier.
12. Install companion flange and hold firmly, then insert pinion into companion flange.
13. Temporarily tighten pinion nut until there is no axial play. Ensure that threaded portion of drive pinion and pinion nut are free from oil or grease.
14. Tighten pinion nut by degrees until preload is 10-14 inch lbs. When checking preload, turn drive pinion several times in both directions to seat bearings.
15. Install differential case assembly with side bearing outer races into gear carrier.
16. Align mark on bearing cap with mark on gear carrier and install bearing cap on gear carrier.
17. Measure ring gear to drive pinion backlash with dial indicator. If backlash is less than .0051-0071 inch, decrease thickness of left shim and increase thickness of right shim by same amount. If backlash exceeds .0051-.0071 inch, increase thickness of right shim and decrease thickness of left shim by same amount. Never change the total amount of shims to prevent changing bearing preload.
18. Check total preload, which should be 10-19 inch lbs. If preload is too great, remove same amount of shims from each side. If preload is too small, install same amount of shims on each side.
19. Recheck ring gear to drive pinion backlash and check run out of gear. If backlash varies excessively in different places, foreign matter may be trapped between ring gear and differential case.
20. If backlash varies greatly and ring gear run out is .0031 inch or less, the hypoid gear set or differential case needs to be replaced.