LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 1985 >> 300ZX GL, Automatic >> Labor Times >> Other Variant >> Engine Mechanical >> Mechanical >> Cylinder Head Gasket >> Remove & Replace

Cylinder Head Gasket: Remove & Replace

WARNING: This page is about the 300ZX Base, 3.0 C, Automatic, which is a different variant/trim than selected.
Includes: Remove carbon and check surfaces for warpage. Includes adjust Valves (where applicable) and clean and adjust Spark Plugs.

Applies ToNoteStandard HoursWarranty HoursSkill Level
Turbocharger, BothIncludes: R&I Engine Assembly.12.7B
Turbocharger, LeftIncludes: R&I Engine Assembly.10.2B
Turbocharger, Right SideIncludes: R&I Engine Assembly.7.9B
Additional Procedure: CYLINDER HEAD GASKET: Remove & Replace:
Where Air Cond interferes add0.3B
Where Pwr Strg interferes add0.3B
Combination Procedure: CYLINDER HEAD: Disassemble & Assemble:
D&A for Sublet machine operations. Use Necessary Clock Time.B