LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 1978 >> F10 2D Hatchback >> Repair and Diagnosis >> Engine Performance >> Fuel Delivery >> HITACHI DCG, DCH & DCJ 306 2-Barrel Carburetors >> Overhaul >> Disassembly

HITACHI DCG, DCH & DCJ 306 2-Barrel Carburetors: Overhaul: Disassembly

  1. Main jets and needle valves on both primary and secondary sides are accessible from outside carburetor. Remove for service as necessary.
  2. Remove throttle return spring, accelerator pump lever and connecting rod. Remove spring hanger and choke linkage if equipped and choke housing. Remove carburetor main body cover being careful not to damage float.
  3. Remove accelerator piston, return spring and check ball. Remove float, needle valve and filter. Remove air bleeds and emulsion tubes. Remove slow jets and power valve. Remove drain plugs and main jets. Remove servo diaphragm by-pass jet and air bleed.
  4. Remove throttle body from main body with (3) set screws. Do not remove anti-dieseling solenoid except to replace. Throttle body should not be disassembled unless a throttle valve or rod is being replaced.
    Fig 1: Choke Unloader Adjustment
    G09326641Courtesy of NOT AVAILABLE