INSPECTION PROCEDURE 10: Blower motor power supply system: Diagnosis
WARNING: This page is about a different car, the 2014 Mitsubishi Outlander. However, it is still accessible from the selected car via links, so may be relevant.
- STEP 1. Measure the voltage at blower relay connector.
- Remove the relay, and measure at the junction block side.
- Voltage between terminals 1, 4 and body ground.
OK: System voltage
Q: Is the check result normal?
- YES: Go to Step 3.
- NO: Go to Step 2.
- STEP 2. Check of open circuit in blower relay power supply line between blower relay connector and fusible link (5). NOTE: Prior to the wiring harness inspection, check ETACS-ECU connector and repair if necessary.
Q: Is the check result normal?
- YES: Intermittent malfunction (Refer to HOW TO COPE WITH INTERMITTENT MALFUNCTION ).
- NO: Repair the connector(s) or wiring harness.
- STEP 3. Check of open circuit in blower motor line between blower motor connector terminal and blower relay. NOTE: Prior to the wiring harness inspection, check ETACS-ECU connector and repair if necessary.
Q: Is the check result normal?
- YES: Go to Step 4.
- NO: Repair the connector(s) or wiring harness.
- STEP 4. Retest the system.
Check that the blower motor is energized.
Q: Is the check result normal?
- YES: Intermittent malfunction (Refer to HOW TO COPE WITH INTERMITTENT MALFUNCTION ).
- NO: Replace the ETACS-ECU.