Resistance Test (Turbo)
- Remove instrument cluster from instrument panel. See INSTRUMENT CLUSTER under REMOVAL & INSTALLATION.
- Measure resistance between boost pressure gauge terminals on back of instrument cluster or combination gauges using ohmmeter. SeeFig 1 . Resistance should be 72 ohms. If resistance is not as specified, replace gauge.