Continuity Tests
Using an ohmmeter, check for continuity between appropriate switch terminals with ECS switch in ON and OFF positions. See ECS SWITCH CONTINUITY TEST SPECIFICATIONS table. See Figure.
ECS SWITCH CONTINUITY TEST SPECIFICATIONS
| Application | Continuity Between Terminals No. | |
|---|---|---|
| ECS Switch Position | ||
| ON | 3 & 4 and 10 & 11 | |
| OFF | 3 & 4 | |