Installation (Colt, Colt 200, Mirage 1.5L & Summit)
- Install cylinder head gasket with identification mark toward timing belt, facing up. Install cylinder head. See Fig 1. DO NOT apply sealant to head gasket. Tighten bolts to specification in sequence, in 2-3 stages. See Figure. See TORQUE SPECIFICATIONS .
- Install timing belt and camshaft sprocket in original location. Ensure timing marks are aligned. See TIMING BELT . To complete installation, reverse removal procedure. Refill cooling system. Adjust all control cables.
Courtesy of CHRYSLER MOTORS.