Prepare for the installation of the turbocharger
- Check the screw-in depth (A) of the upper stud bolt (1), if necessary screw in the stud bolt (1) further and unscrew it.
- Check the screw-in depth (B) of the upper stud bolt (2), if necessary screw in the stud bolt (2) further and unscrew it.
TECHNICAL DATA SPECIFICATIONS
| Screw-in depth of upper stud bolts on cylinder head | |
|---|---|
| Dimension A | 30 mm |
| Dimension B | 26 mm |
- If necessary, fix the stud bolt (1) with screw locking agent.
| Adhesive | ||
|---|---|---|
| Screw lock Loctite 273, high strength | 50 ml, Bottle | 83190443083 |
NOTE:
RISK OF DAMAGE
Damage to the surface.
The use of metal-cutting tools (e.g., emery cloths) for cleaning surfaces can damage them and lead to leaks and/or engine damage.
Damage to the surface.
The use of metal-cutting tools (e.g., emery cloths) for cleaning surfaces can damage them and lead to leaks and/or engine damage.
- Do not use any metal-cutting tools.
- Clean sealing surfaces on exhaust manifold and cylinder head (1) with special tool 0 495 102 (11 4 470) .
- Check the nuts for correct fit in sequence (1) to (5).
TIGHTENING TORQUES SPECIFICATIONS
| Trim strip at the cylinder head | ||
|---|---|---|
| M7 | Tightening torque | 18 Nm |
- Check the oil feed lines and oil return lines for contamination or obstruction, clean or replace if necessary.
- If the oil feed lines or oil return lines are heavily contaminated, it is recommended that the engine oil and oil filter are changed.
- If installed: Check the coolant feed lines and coolant return lines for the turbocharger for contamination or obstruction and clean or replace as needed.
- Check the screw connections and plug connections of all lines for accuracy.
- Check air cleaner for contamination and clean or replace as needed.
- Check correct functioning of crankcase ventilation.
- Replace all gaskets.
Parts: Seals