Installing the battery
- Insert and install vehicle battery (4).
- Insert the holder with the screw (3) and install.
- Tighten down screw (3).TIGHTENING TORQUES SPECIFICATION
Retaining rail to battery carrier Hexagon screw Tightening torque 15 Nm - Connect the air bleeder hose (arrow) to the battery (2).
- Insert and install the positive battery cable (1).
- Tighten the nut on the positive battery cable (1).TIGHTENING TORQUES SPECIFICATION
Positive battery terminal to battery Nut M6 Tightening torque 5 Nm - F56 Battery Electric Vehicle:
Feed in the heat pump controller (4) and position correctly.
Clip in the cable clip (2).
Connect connectors (1) and lock.
Replace screws (3).
Parts: screws.
Tighten the screws (3).
TIGHTENING TORQUES SPECIFICATIONControl unit bracket to battery tray Screw tightening torque 15 Nm - Install the tension strut (1).
- Tighten screws (arrows).TIGHTENING TORQUES SPECIFICATION
Tension strut to battery tray M8 Tightening torque 19 Nm - Install the mount (1) for the seal and secure with the expanding rivet (arrow).
- Thread in and install battery earth lead (2).
- Tighten nut (1).TIGHTENING TORQUES SPECIFICATION
Battery terminal clamp on battery terminal M6 Tightening torque 5 Nm - Connect connectors (3) and lock.
The connector (3) must engage audibly.
Follow-up work
- Refer to DISCONNECTING ALL BATTERY GROUND LEADS .
- Refer to REGISTER BATTERY CHANGE .